Future Projects
FY 2025-FY 2028
- MacLean Campus Center HVAC system retro-commissioning
- Testing the recently modified HVAC system and making the required adjustments and modifications to the heating and cooling systems to ensure maximum operating efficiency.
- Science & Engineering building main corridor flooring upgrade
- Resurface the main corridor concrete floors on levels 1 - 3 with a new smooth finish.
- CVPA building roof replacement
- A continuation of the building restoration project that will include replacing the existing roof system.
- Violette building roof replacement
- Replace the existing 20 year old roofing system.
- Foster Administration building window systems replacement
- Replace the existing 50+ year old windows with new triple pane energy efficient window systems.
- Main Campus wayfinding signage upgrade
- Replace existing wayfinding signage with new throughout the main campus.
- Main Campus walkways accessibility upgrades
- Modifications will be made to exterior walkways, stairs and ramps throughout main campus to meet ADA standards