Skip to main content.

Future Projects

FY 2025-FY 2028

  • MacLean Campus Center HVAC system retro-commissioning
    • Testing the recently modified HVAC system and making the required adjustments and modifications to the heating and cooling systems to ensure maximum operating efficiency.
  • Science & Engineering building main corridor flooring upgrade
    • Resurface the main corridor concrete floors on levels 1 - 3 with a new smooth finish.
  • CVPA building roof replacement
    • A continuation of the building restoration project that will include replacing the existing roof system.
  • Violette building roof replacement
    • Replace the existing 20 year old roofing system.
  • Foster Administration building window systems replacement
    • Replace the existing 50+ year old windows with new triple pane energy efficient window systems.
  • Main Campus wayfinding signage upgrade
    • Replace existing wayfinding signage with new throughout the main campus.
  • Main Campus walkways accessibility upgrades
    • Modifications will be made to exterior walkways, stairs and ramps throughout main campus to meet ADA standards
Back to top of screen